Technical problems with compressor unit at Zuidwending Storage Facility solved

24 Sep 2013

Gasunie Zuidwending is pleased to announce that all the high voltage transformers at the Gasunie Zuidwending facility have been repaired or replaced. After the initial fire in one of the high voltage transformers in January, three out of five transformers have been repaired and two transformers have been replaced and all transformers are now back in operation.


On May 20, 2014 Gasunie Zuidwending changed its company name to EnergyStock. This news item was posted by EnergyStock’s predecessor Gasunie Zuidwending before the name change.