Rescheduling maintenance periode 2019

23 Jul 2019

EnergyStock has to reschedule its upcoming maintenance period, which was scheduled for Monday 9 September 2019 06:00 (04:00 UTC) until Saturday 14 September 2019 06:00 (04:00 UTC). The maintenance will now be carried out from gas day Wednesday 13 November 2019 06:00 (04:00 UTC) until Monday 18 November 06:00 (04:00 UTC). During the whole maintenance period there will be no flexibility services available.

The reason for rescheduling the maintenance period is that the repair work on the withdrawal system cannot be scheduled in September 2019. For reliability reasons, EnergyStock has now rescheduled the planned maintenance before the winter, the period in which the send-out functionality will typically be used more intensively.

We have planned the repair work partly in the weekend, different to the period in September, as historical data show significant lower nominations during the weekend than during working days. In this way we aim to minimize the impact as much as possible.